BIM Specialist • Architect • CA/2018/91627

Christopher
Marandi

Architectural technologist bridging the gap between visionary design and digital precision.

Miami Dolphins - Jet Aviation Hangars

Construction of 5 new hangars in phases at Opa-locka Airport. Phase 1 includes a modern 8,800 sq.ft FBO, 5,070 sq.ft CBP facility, 8,880 sq.ft Tenant Space, and a 44,320 sq.ft hangar with pre-engineered metal structure.

PROJECT DETAILS

  • Project Type: Aviation
  • Location: Opa-locka, Miami-Dade County, FL, USA
  • Size: 70,000 SQ.FT
  • BIM Scope: SD, DD, and CD - BIM modeling, documentation, visualization, animation, coordination and clash detection across all ASMEP disciplines.
  • Phase 1: Includes FBO, CBP facility, Tenant Space, and 44,320 sq.ft hangar.
  • Features: Pre-engineered metal structure with high-end modern finishes.
Aviation Project Slide 1
01 / 23

Kaiser Permanente Sunnyside Medical Center

A new 7-story, 615,000 SF hospital built on the east side of the Sunnyside Campus in Clackamas, OR.

PROJECT DETAILS

  • Project Type: Healthcare | Size: 615,000 SF | Location: Clackamas, OR
  • BIM Scope: SD, DD, CD & PERMIT/BID
  • Includes 308 patient beds, emergency department, imaging, surgery center, and family birthing center.
  • Design serves as a template based on the Kaiser Permanente San Diego Medical Center.
  • Includes a new central utility plant and phased demolition of existing campus buildings.
Healthcare Project Slide 1
01 / 29

Scripps Mercy Medical Center

Replacement of existing acute care building with a new seismically sound 12-story tower (3 below ground). Features mostly private rooms and central energy plant upgrades.

PROJECT DETAILS

  • Project Type: Healthcare
  • Location: 4077 Fifth Ave, San Diego, CA 92103, United States | Completion: 2027
  • Size: 710,000 SQ.FT (Total) | 12-Story Tower (3 Below Ground)
  • BIM Scope: SD, DD, CD & PERMIT/BID
  • Features: Seismically sound tower, private rooms, and central energy plant upgrades.
  • BIM management focused on seismic structural coordination and MEP integration.
Scripps Mercy - Site Plan
01 / 08

Kaiser Permanente San Marcos Hospital

Medical center construction on 121,000 sq.ft site, co-located next to outpatient and specialty care buildings. Features landscaped courtyard separating new hospital from existing medical center.

PROJECT DETAILS

  • Project Type: Healthcare
  • Location: 400 Craven Rd, San Marcos, CA 92078 | Completion: 2023
  • Size: 433,230 GSF (Hospital) | 121,000 SQ.FT Site | 206 Beds
  • BIM Scope: Interior Elevations for Public Spaces, Support Spaces, Nurse Stations, Corridors, FOH & BOH, Toilet Rooms and Patient Rooms
  • Program: 51 emergency bays, 8 ORs, 2 IR suites, and comprehensive imaging.
  • Design: Inspired by local lakes/mountains, emphasizing 'points of discovery' and LEED Gold targets.
San Marcos Hospital Exterior
01 / 10

Park Sydney – Stage 1

A major mixed-use residential development featuring two 8-storey buildings with 330 apartments and integrated retail precinct.

PROJECT DETAILS

  • Project Type: Mixed-Use Residential
  • Location: 88 MacDonald St, Erskineville NSW 2043, Australia
  • Size: 740,000 SQ.FT | 330 Apartments
  • BIM Scope: Development Approval drawings with DD through CD
  • Stage 1: Buildings B & C (Botany and Cascade) featuring Studio, 1, 2 & 3 bedroom apartments.
  • Retail: 5,000 sqm total including Woolworths Metro (1,600 sqm) and specialty retail.
  • Features: Angled balconies for privacy, maximizing natural daylight and shading.
Park Sydney Stage 1 - Image 1
01 / 19

THE ARCHITECT

Digital Precision,
Physical Presence.

With over 8 years of experience in BIM management and architectural design, I specialize in bridging the gap between complex digital workflows and tangible building excellence.

8+

Years Experience

50+

Projects Delivered

03

Global Regions

100%

Delivery Focus

PROFESSIONAL TIMELINE

Jan 2024 – Present

Project Manager (BIM)

studio PARAMETRIC

Supervising project teams, leading multiple projects, managing client interactions, and enforcing high-quality standards.

Sep 2022 – Dec 2023

BIM Team Lead

studio PARAMETRIC

Led design processes for 40+ projects (LOD 350/400), managed visual presentations, and coordinated with engineering teams.

Sep 2021 – Aug 2022

BIM Architect Level 2

studio PARAMETRIC

Coordinated multidisciplinary teams, performed project analysis using BIM, and mentored junior staff.

Aug 2019 – Aug 2021

BIM Architect

studio PARAMETRIC

Collaborated on BIM model development and optimized building performance through digital tools.

Jul 2017 – Aug 2019

Junior Architect

studio PARAMETRIC

Assisted in the design process, produced detailed 3D models/drawings, and prepared project documentation.

EDUCATION

2012 – 2017

Bachelor of Architecture

NIT Tiruchirappalli

Specialized in high-performance building design and digital fabrication. Active in Art, Music, and Athletics.