Christopher
Marandi
Architectural technologist bridging the gap between visionary design and digital precision.
CURRENT STATUS
Available for innovative architectural partnerships 2026.
SELECTED WORKS
Case Studies
A curated collection of BIM-intensive projects across aviation, healthcare, and residential sectors.
aviation
Miami Dolphins - Jet Aviation Hangars
Construction of 5 new hangars in phases at Opa-locka Airport. Phase 1 includes a modern 8,800 sq.ft FBO, 5,070 sq.ft CBP facility, 8,880 sq.ft Tenant Space, and a 44,320 sq.ft hangar with pre-engineered metal structure.
healthcare
Kaiser Permanente Sunnyside Medical Center
A new 7-story, 615,000 SF hospital built on the east side of the Sunnyside Campus in Clackamas, OR.
healthcare-scripps
Scripps Mercy Medical Center
Replacement of existing acute care building with a new seismically sound 12-story tower (3 below ground). Features mostly private rooms and central energy plant upgrades.
healthcare-san-marcos
Kaiser Permanente San Marcos Hospital
Medical center construction on 121,000 sq.ft site, co-located next to outpatient and specialty care buildings. Features landscaped courtyard separating new hospital from existing medical center.
residential
Park Sydney – Stage 1
A major mixed-use residential development featuring two 8-storey buildings with 330 apartments and integrated retail precinct.
Miami Dolphins - Jet Aviation Hangars
Construction of 5 new hangars in phases at Opa-locka Airport. Phase 1 includes a modern 8,800 sq.ft FBO, 5,070 sq.ft CBP facility, 8,880 sq.ft Tenant Space, and a 44,320 sq.ft hangar with pre-engineered metal structure.
PROJECT DETAILS
- Project Type: Aviation
- Location: Opa-locka, Miami-Dade County, FL, USA
- Size: 70,000 SQ.FT
- BIM Scope: SD, DD, and CD - BIM modeling, documentation, visualization, animation, coordination and clash detection across all ASMEP disciplines.
- Phase 1: Includes FBO, CBP facility, Tenant Space, and 44,320 sq.ft hangar.
- Features: Pre-engineered metal structure with high-end modern finishes.

Kaiser Permanente Sunnyside Medical Center
A new 7-story, 615,000 SF hospital built on the east side of the Sunnyside Campus in Clackamas, OR.
PROJECT DETAILS
- Project Type: Healthcare | Size: 615,000 SF | Location: Clackamas, OR
- BIM Scope: SD, DD, CD & PERMIT/BID
- Includes 308 patient beds, emergency department, imaging, surgery center, and family birthing center.
- Design serves as a template based on the Kaiser Permanente San Diego Medical Center.
- Includes a new central utility plant and phased demolition of existing campus buildings.

Scripps Mercy Medical Center
Replacement of existing acute care building with a new seismically sound 12-story tower (3 below ground). Features mostly private rooms and central energy plant upgrades.
PROJECT DETAILS
- Project Type: Healthcare
- Location: 4077 Fifth Ave, San Diego, CA 92103, United States | Completion: 2027
- Size: 710,000 SQ.FT (Total) | 12-Story Tower (3 Below Ground)
- BIM Scope: SD, DD, CD & PERMIT/BID
- Features: Seismically sound tower, private rooms, and central energy plant upgrades.
- BIM management focused on seismic structural coordination and MEP integration.

Kaiser Permanente San Marcos Hospital
Medical center construction on 121,000 sq.ft site, co-located next to outpatient and specialty care buildings. Features landscaped courtyard separating new hospital from existing medical center.
PROJECT DETAILS
- Project Type: Healthcare
- Location: 400 Craven Rd, San Marcos, CA 92078 | Completion: 2023
- Size: 433,230 GSF (Hospital) | 121,000 SQ.FT Site | 206 Beds
- BIM Scope: Interior Elevations for Public Spaces, Support Spaces, Nurse Stations, Corridors, FOH & BOH, Toilet Rooms and Patient Rooms
- Program: 51 emergency bays, 8 ORs, 2 IR suites, and comprehensive imaging.
- Design: Inspired by local lakes/mountains, emphasizing 'points of discovery' and LEED Gold targets.

Park Sydney – Stage 1
A major mixed-use residential development featuring two 8-storey buildings with 330 apartments and integrated retail precinct.
PROJECT DETAILS
- Project Type: Mixed-Use Residential
- Location: 88 MacDonald St, Erskineville NSW 2043, Australia
- Size: 740,000 SQ.FT | 330 Apartments
- BIM Scope: Development Approval drawings with DD through CD
- Stage 1: Buildings B & C (Botany and Cascade) featuring Studio, 1, 2 & 3 bedroom apartments.
- Retail: 5,000 sqm total including Woolworths Metro (1,600 sqm) and specialty retail.
- Features: Angled balconies for privacy, maximizing natural daylight and shading.

THE ARCHITECT
Digital Precision,
Physical Presence.
With over 8 years of experience in BIM management and architectural design, I specialize in bridging the gap between complex digital workflows and tangible building excellence.
8+
Years Experience
50+
Projects Delivered
03
Global Regions
100%
Delivery Focus
PROFESSIONAL TIMELINE
Jan 2024 – Present
Project Manager (BIM)
studio PARAMETRIC
Supervising project teams, leading multiple projects, managing client interactions, and enforcing high-quality standards.
Sep 2022 – Dec 2023
BIM Team Lead
studio PARAMETRIC
Led design processes for 40+ projects (LOD 350/400), managed visual presentations, and coordinated with engineering teams.
Sep 2021 – Aug 2022
BIM Architect Level 2
studio PARAMETRIC
Coordinated multidisciplinary teams, performed project analysis using BIM, and mentored junior staff.
Aug 2019 – Aug 2021
BIM Architect
studio PARAMETRIC
Collaborated on BIM model development and optimized building performance through digital tools.
Jul 2017 – Aug 2019
Junior Architect
studio PARAMETRIC
Assisted in the design process, produced detailed 3D models/drawings, and prepared project documentation.
EDUCATION
2012 – 2017
Bachelor of Architecture
NIT Tiruchirappalli
Specialized in high-performance building design and digital fabrication. Active in Art, Music, and Athletics.